- IMPSA Kalayaan I
  - Alson Cement
  - San Roque Multipurpose    Dam
  - Solid Cement
  - Continental Cement
  - Apo Cement

Delivered / Finalist Projects

     Delivered, installed, commissioned for Kalayaan I
     Project CBK / IMPSA in Laguna


View Top of Intake
Hydraulic System in
the Cellar
Front View

2,300Liter Tank with 2 Motor – Pump Station
Side View
We designed, manufactured, installed and commissioned the Complete Hydraulic System for Kalayaan I, Project of CBK / IMPSA in Laguna.

Hydraulic Power Station with 2,300Liter Tank and 2 Motor – Pump Station each with a High Flow – Low Pressure / Low Flow – High Pressure Pump and necessary controls equipped.

Picture at the right shows the Tank Top with Valve Manifolds, Return Filter and Silica Gel Tank Breather Filter and Air Exhaust Valve.



GERMAN HYDRAULIC & PLANT SERVICE, INC.
Unit 2 Southway Building Yakal corner Mayapis St.,
San Antonio Village Makati City
Tel./Fax (632) 813-5349 * 813-5369
Direct Fax (632) 853-6158

An ISO Certified Company ISO 9001:2008
Member of the European Chamber of Commerce of the Philippines